The beginning
Since 1869 a new branch line of the London and North Western Railway from
Caernarfon to Llanberis had brought people to the foot of Snowdon, however,
the only way to reach the peak then was to walk or take a donkey ride,
so it was declared that the next extension must go to the top of Snowdon.
The local landowner George William Duff Assherton Smith thought a railway
would spoil the scenery and turned down every proposal for the next twenty
years but then a rival plan to build a railway to the summit of Snowdon,
from Rhyd Ddu station on the other side of the mountain, brought fears
that Llanberis would lose it’s tourist trade forever.
With this in
mind Assherton Smith changed his decision and allowed the land to be used
and on the 16th November 1894 the Snowdon Mountain Tramroad and Hotels
Co. Ltd was formed to build the railway.

Technology
To ensure the trains were able to embark upon the steep and continual gradients of Snowdon safely, the newly formed Snowdon Mountain Tramroad and Hotels Co. Ltd went to Switzerland to find the best mountain railway technology. A German engineer, Dr. Roman Abt, had patented a rack and pinion system that was being used reliably in the Swiss Alps. Whilst in Switzerland the company purchased three steam locomotives and they arrived in Llanberis in 1895 to help with the construction, a further two trains arrived in 1896 when the railway opened.Smooth and constant operation when tackling the steep gradients is achieved by a double racked rail used with a rotating toothed pinion. The pinion is mounted underneath the locomotive and guarantees the locomotive does not lose grip on the mountain. The pinion is the only source of traction for the locomotive with the wheels supporting the weight of the engine. Unique to rack railways, the locomotive always pushes the carriage up the mountain and, for safety reasons, is never coupled to the train. The carriage has its own set of brakes that bring the carriage to a standstill if it disengages from the locomotive.

The building of the railway
The first sod was cut at Llanberis station by Assherton Smith’s daughter Enid in December 1894. The railway was due to be ready for summer 1895 however, the harsh winter of 1894 was one of the worst in living memory, and the construction of the two large viaducts between Llanberis and the waterfall took much longer than expected and they were not completed until August 1895. Once the viaducts were completed the remaining track to the Summit was laid in a remarkable 72 days and the first train reached the summit in January 1896. With the remaining work on fencing and signals then being finished the railway was ready to open to the public at Easter 1896.Locomotive History
Locomotive number one, L.A.D.A.S., was named after Laura Alice Duff
Assheton Smith, the wife of the local landowner. Arrived in 1895
and played a pivotal role in the construction process. L.A.D.A.S.
is no longer in service.
Locomotive number two, Enid, was named after Assheton Smith’s
daughter who cut the first sod at Llanberis in 1894. Enid is still
in service today and it is estimated that she has covered enough
miles in her history to reach the moon and back four times.
Locomotive number three, Wyddfa, is the Welsh name of Snowdon. Wyddfa
is still in service today.
Locomotive number four, Snowdon, is named after the mountain and
arrived in 1896 when the railway opened. Snowdon is also still in
service today.
Locomotive number five, Moel Siabod, is named after a neighbouring
mountain and is out of service at present awaiting boiler repairs.
In 1922/23 a further three locomotives (six, seven and eight) were
ordered from the Swiss locomotive and machine works Winterthur.
Locomotive number six, Padarn, is named after the lower lake in Llanberis
and is still in service today.
Locomotive number seven, Ralph, is named after the one time company
consulting engineer Ralph Sadler. It was removed from service and
dismantled in the 1980’s.
Locomotive number eight, Eryri, is the Welsh name for Snowdonia.
It was also removed from service and dismantled in the 1980’s.

Diesel Engines
Between 1986 and 1992 the company took delivery of 4 British built diesel locomotives.
The names of the diesels are: Ninian, Yeti, Peris and George.
Diesel Electric Railcars
Snowdon Mountain Railway took delivery in 1995 of three diesel-electric railcars
capable of multiple unit operation. The railcars are currently out of service.
Carriages
The original carriages were open above the waist and had canvas curtains, which
provided little protection against the elements. Between 1951 and 1957 the superstructure
of the original carriages was modified to produce the enclosed bodies that they
sport today. In earlier times, pictures showed the trains pushing two carriages,
the rear carriage was roofed with canvas curtains.